Sample only — fictional quotation data

Sample PRDT AI Renovation Quotation Comparison

A fictional example: 4-room HDB resale, partial-to-major renovation, budget $50,000–$70,000, three quotations with different scope. Your own comparison is built from your actual documents and reviewed by a PRDT designer.

PRDT Interiors — Sample Comparison

AI Renovation Quotation Comparison

Quotation A
$52,800
GST not included
Quotation B
$61,455
GST included
Quotation C
$68,900
GST included

2. Important Notice

This report compares the contents of the uploaded documents only. It does not assess contractor quality, workmanship or trustworthiness.

3. Executive Summary

Quotation A has the lowest stated total, but disposal is stated as excluded, tiling is not clearly stated, and GST has not been added — the like-for-like gap to B and C is smaller than the headline totals suggest. Quotation B provides the strongest carpentry specification but prices electrical as a provisional allowance, which may change. Quotation C has the highest total and appears to include the broadest scope (ceiling works, plumbing relocation, itemised electrical), although its tile allowance may still require clarification.

5. Category-by-Category Comparison

CategoryQuotation AQuotation BQuotation C
HackingIncluded (lump sum)Included, with disposalIncluded, itemised
Disposal & haulageExcluded (stated)IncludedIncluded
TilingNot clearly statedAllowance $3.50/sqft supplyIncluded, $4.80/sqft allowance
FlooringIncluded (vinyl, grade not stated)Included (5.5mm premium vinyl)Included (tiles, living areas)
CarpentryIncluded (laminate, range not stated)Included — Blum hinges, ABS trimIncluded — full spec + internal finish
Electrical20 points, supply & installProvisional allowance $2,50032 points itemised
PlumbingSink installation onlyNot clearly statedIncluded, incl. relocation
PaintingIncluded (brand stated)Included (sealer + 2 coats)Included
CeilingNot mentionedNot mentionedIncluded (L-box, living)
CleaningNot mentionedIncluded (chemical wash)Included
Warranty12 months workmanship24 months carpentry only18 months, exclusions listed
Payment terms10/40/45/520/40/4010/30/30/25/5

8. Possible Missing Items

  • Ceiling works — not found in Quotations A and B
  • Post-renovation cleaning — not found in Quotation A
  • Plumbing relocation — not found in Quotations A and B; may be included elsewhere, but not clearly stated
  • Disposal & haulage — stated as excluded in Quotation A

9. Ambiguous or Vague Wording

  • Quotation A — "laminate finish": range/grade not stated; final selection may affect price
  • Quotation B — "electrical wiring as required — allowance": provisional; actual cost may differ
  • Quotation B — "selected range" sanitary fittings: brand and model should be clarified
  • Quotation C — "subject to site condition" on hacking: scope of possible additions should be clarified

11. Payment-Term Comparison

  • • Quotation A — 10% deposit · 40% commencement · 45% carpentry delivery · 5% completion
  • • Quotation B — 20% deposit · 40% mid-progress · 40% before handover (no completion retention)
  • • Quotation C — 10% · 30% · 30% · 25% · 5% on completion

A larger portion payable before handover reduces your leverage on rectification — worth discussing, not a legal conclusion.

13. Questions to Ask Each Contractor

Quotation A

  • • Is GST payable on top of the $52,800 total?
  • • What exact laminate range is included, and are internal cabinet surfaces finished?
  • • What would disposal and haulage cost, since they are excluded?

Quotation B

  • • How will the $2,500 electrical allowance be reconciled against actual points?
  • • Which sanitary brand/models fall within the "selected range"?

Quotation C

  • • What tile price does the $4.80/sqft allowance assume, and who supplies?
  • • What site conditions would trigger additional hacking charges?

Disclaimer

This is a fictional sample for illustration. A real comparison is based only on the documents and information uploaded. It does not verify contractor credentials, workmanship, financial standing, legal compliance, authority approval, final measurements or actual site conditions. Items marked as missing may appear elsewhere or may require clarification.

Holding quotations like these?

AI-assisted. Human-reviewed by PRDT. No obligation.